| View from entry, through the dining room and kitchen and into the great room |
Stopped by the lot to check on the chosen stain color for the cabinets and talk with Tom about the driveway, front walk, and septic field locations. Past the half way point now, with all the drywall in and 95% of the cabinetry installed. It pretty much looks one big white marshmallow house! Maybe a little graham cracker thrown in. Next week the counter top folks will be coming by to make the templates for the counters, and the electricians and plumbers will begin their finish out work. The tile install comes after the counters get installed. Still another 6 or 8 weeks before it's all finished - can it really be 65% done? Seems like a lot of work still left!
| View across the bar into the kitchen |
| View into the front hall and dining room from the great room |
| Great room fireplace and niche |
| View into great room from kitchen |
| Master bedroom |
| Master bath shower and tub platform |
| Master bath vanities |
| View to front yard from David's study |
| Utility room |
| Cabinet stain - center of panel = chosen shade (not edges, too light, not panel to left, too orange) |